Project Submissions Process

You can now submit your new and revised projects via our OnStation Portal. Follow this how to guide to seamlessly upload your projects into the OnStation!

 

Steps to Access Project Submissions to View and Submit


  1. Log into the OnStation Portal by navigating to our website https://www.onstationapp.com/ and then clicking on the LOGIN in the top right corner.
  2. This will bring you to the OnStation Portal https://portal.onstationapp.com/
    1.  image (115)
  3. Use your OnStation Account phone number or email to login. 
    1. image (116)
  4. On the left hand side of your screen click the "Project Submissions" tab 
  5. You will now see your project submission dashboard page. After submitting your projects you will see the full list here, along with their upload status
      1. Project Submission Dashboard

Project Status Details

Throughout the submission process you will be able to check the progress of your project, so you know exactly when it goes live.

STEP 01: PROJECT SUBMITTED

When a project is in the Project Submitted status this means that we've received your project details and files

STEP 02: READY FOR BUILD

Projects where we have received all the files we need to build your project will be placed in a Ready for Build status.  If we have any questions prior to this status our OnStation team will reach out to the submitter directly.

STEP 03: IN PROGRESS

Once our Engineers start to work on your project it will be placed in an "In Progress" status.

STEP 04: PROJECT RELEASED

When the Engineers have completed your project it will be placed in a Project Released status.

Recommended File Types by Category

Category File Type
Alignment / Stationing files xml (Land XML) or ALG
PDF Plan Sets PDF
Project Layers DGN, DWG, DXF
Work Items / PLI Excel or txt

 

Steps to Submit New Project

If you are requesting a new project you will want to follow this steps to enter your request.
  1. At the top of the Project Submissions page click "Submit new project"
  2. You will now be prompted to input all of your new project details 
  3. Providing Coordinate Systems
    1. Verify coordinate system is attached to files submitted or note the coordinate system used to design the project. This will ensure your alignment layer is displayed in the correct location in the app.
    2. Please be sure to specify scale factor and other transformations if applicable.
    3. Make sure the files submitted have been drawn in the coordinate system.
  4. Once you have entered all the required information, the "create" button in the bottom right corner will be highlighted green and you will be able to click it to move onto the next step 
  5. After clicking the create button you will be taken to the "project file upload" page with 4 dropdown menus consisting of 4 sections detailed below. Each dropdown menu will give you the option to add your files via "Browse files" or by dragging and dropping files from your saved folders

    1. Alignment / Stationing files
      1. Recommended File Types: xml (Land XML) or ALG
    2. PDF Plan Sets
      1. Recommended File Type: PDF
    3. Project Layers
      1. Recommended File Types: DGN, DWG, DXF
    4. Work Items / PLI
      1.  Recommended File Type: Excel or txt
  6. QUESTION: Do you want to add other users to be notified when the project gets released?  If so, follow the steps in the Add Users section below before following the next steps and clicking "SUBMIT". 
  7. Once you have uploaded all of your files into the applicable section, and you have added any additional persons you want to be notified of project release,  you will then want to click "SUBMIT"
  8. You will then get a second prompt asking you to confirm your submission.  It will read: "Wait!
    Are you sure you want to submit your project? Once you submit, you won't be able to modify any project details/files."  You will then be able to click Cancel or Submit Project
  9. After clicking "Submit Project" you should then see your project under the Project Submissions section listed as type NEW and with a status of "SUBMITTED".

Click here for a refresher on the applicable project status list

 

Steps to Submit Project Updates

In the event that you have a revision to an existing project, for example revised alignments, layers, plans, you will want to follow these steps to send in your project revisions.

  1. Via the  "Project Submissions" tab you will now see a page that displays a list of your projects along with their upload status 
  2. At the top portion of your screen, click the "Submit project update" button
  3. Use the "Select Project" window to search for the OnStation Project you wish to revise
  4. Once you have found the project click "Select" next to the Project name
  5. Upload the applicable project revision files for the Alignment /Stationing, PDF Plan Sets, Project Layers, and/or Work Items/PLI as needed
  6. QUESTION: Do you want to add other users to be notified when the project gets released?  If so, follow the steps in the Add Users section below before following the next steps and clicking "SUBMIT UPDATE". 
  7. Once all files have been uploaded click "Submit Update"
  8. You will  then get a second prompt asking you to confirm your submission.  It will read: "Wait! Are you sure you want to submit your project? Once you submit, you won't be able to modify any project details/files."  You will then be able to click Cancel or Submit Project
  9. After clicking "Submit Project" you should then see your project under the Project Submissions section listed as type UPDATE and status of SUBMITTED

See section above for recommended file types for each category

Click here for a refresher on the applicable project status list

Notify Other Users About Project

In the event that you want other persons / groups to receive a notification when the project gets released, you can use the following steps to Add Users to be notified of a project completion.

  1. While Submitting the new project or project updates, click on the click on the "Add Users" menu option 3 .  Note, if you've already submitted the project its not too late to add other users
    1. To get to the above menu AFTER you have already submitted your request:
      1. Locate the project under the Project Submissions menu
      2. Click on the ellipses to the far right of the project and then select "View Project
  2. You can choose to share the project release notification with one or more of the following:
    1. Share with Organization
    2. Select one or more users
    3. Select one or more groups
  3. Once you have made your selection, you will want to hit SAVE to save your changes 
    1.  
  4. You will then see a pop up alert advising "Successfully Updated Project Submission"
    1.  

FAQs

What is the estimated turnaround for a project?

2 weeks

What can I do to help get my project into OnStation Quicker?

Ensure that you have provided us with the following details on your submission:

  1. Coordinate System that was used to design project including noting any scale factor used.  Validate that the files submitted have been drawn in that coordinate system.
  2. Alignment Tips:
    1. Only include project centerlines used for construction
    2. Remove all other alignments from the xml
    3. Use common alignment names
  3. Layer Tips:
    1. Submit base map layers of the construction features desired to be viewed. Too many layers may clutter the view.
    2. Remove all attached files
    3. Turn off all scratch work and other unnecessary linework

Also make sure you tell us that you have an critical need or pressing timeline  in the Additional Comments / Notes section

What else can I submit to ensure I am making the most out of my OnStation project? 

OnStation can display more than just your alignment and layers.  Did you know that..

  1. You can submit any project document including plan sets, line item lists, specifications, and standard drawings
    1. Our Project Library eliminates the hassle of carrying around plans on the job. This means no more worrying about referencing papers while on a jobsite that has unexpected weather conditions. ☔⚡❄️🌪️🌞
  2. You can Submit Project Line Items 
    1. With our flags, chats, and pictures, you can tag project line items so you can organize and manage the communication happening within a project easier.

      Submit an Excel or txt file following the format below:

      Column 1 = line item # Column 2 = line item description

      Line Item Line Item Description
      0001 Guardrail Post
      0002 Curb Type 6
      0003 Curb Type B

What if I don't have the recommended file type you listed?  Can I still submit my project? What else will you accept?

If you don't have the exact preferred file types you can still submit your project.  Here is a list of alternative file types by category that we also work with.  

Warning: Submitting these alternate file types could result in the project taking longer to complete in OnStation

Alignments:

  • Recommended: LandXML (alignments only, no surfaces) will ensure the fastest turnaround time.  However we will also except:
    • ALG (Open Roads)
    • DGN, DWG, DXF
    • KML/KMZ (Not a converted CAD file)
    • Project plans that show the alignment control and geometry. 
    • Reference sheet number including alignment geometry details

Layers:

  • Recommended: DWG, DGN, DXF files will ensure the fastest turnaround time.  However we will also except:
    • KML/KMZ (Not a converted CAD file)
    • SHP

What about importing flags and form data?  I was told I can do that as well.  Where do I submit that?

You absolutely can import flag and form data!  That is something you do after the project has been released and not needed at the time of your project submission.  To learn more about importing flag and form data check out these articles:

Importing Flag Data

Importing Form Data

 

Helpful Related Articles:

Learn more about Project Submission Guidelines:  ➡️ Project Submission Guidelines