We have created these guidelines to help get your projects into OnStation quicker.
Helpful Related Articles:
Learn how to submit a project to OnStation: ➡️ Project Submissions Process
Learn how to add existing projects a user: ➡️ Add Projects to a User
Learn how to add existing projects to your org: ➡️ Add Projects to your Organization
Provide Coordinate Systems
Let us know what coordinate system was used to design the project. This will ensure your alignment layer is displayed in the correct location in the app.- Need to specify scale factor and other transformations if applicable.
- Make sure the files submitted have been drawn in the coordinate system.
Tips:
- Verify coordinate system is attached to files submitted or note the coordinate system used to design the project.
Submit Alignments w/ Stationing
Our Automatic Station Finder only works if we are provided with the correct information to reference. File types include:
- Recommended: LandXML (alignments only, no surfaces) **fastest turnaround time**
- ALG (Open Roads)
- DGN, DWG, DXF
- KML/KMZ (Not a converted CAD file)
- Project plans that show the alignment control and geometry. **could be longer than 2 weeks**
Reference sheet number including alignment geometry details
Tips:
- Only include project centerlines used for construction
- Remove all other alignments from the xml
- Use common alignment names
Submit CAD design drawings, Google Earth, and Esri maps to view Project Layers
Our Design Layers & Maps are very beneficial to reference while on a project. File types include:
- Recommended: DWG, DGN, DXF
- KML/KMZ (Not a converted CAD file)
- SHP
Tips:
- Submit basemap layers of the construction features desired to be viewed. Too many layers may clutter the view
- Remove all attached files
- Turn off all scratch work and other unnecessary linework
Submit any project document including plan sets, line item lists, specifications, and standard drawings
Our Project Library eliminates the hassle of carrying around plans on the job. This means no more worrying about referencing papers while on a jobsite that has unexpected weather conditions. ☔⚡❄️🌪️🌞
Submit Project Line Items
With our flags, chats, and pictures, you can tag project line items so you can organize and manage the communication happening within a project easier.
Submit an Excel or txt file following the format below:Column 1 = line item # Column 2 = line item description
Line Item | Line Item Description |
0001 | Guardrail Post |
0002 | Curb Type 6 |
0003 | Curb Type B |